Flat for sale 4.5 rooms in 1008 Prilly - Vaud
126 m² |
4.5 |
yes |
NEW CONSTRUCTION - 3RD FLOOR - LAKE AND ALPS VIEW
The following text has been translated automatically.
This urban construction located at Chemin des Planches 6 in Prilly, in a green setting, surrounded by century-old trees that have determined its location, offers 16 contemporary apartments combining comfort, aesthetics, and quality of life.
Sheltered from nuisances, in the second line of the Cossonay road, at the height of the « Prilly - église » stop of the high-frequency bus https://bhns-ouest-lausannois.ch, the plot hosting this project combines the advantages of city life with a peaceful environment.
The elegant and airy architecture of the building, as if suspended above the ground, frees the ground floor for common areas, allowing a fluid circulation between the green spaces and the apartments. The latter are accessible either by the two elevator shafts or by means of remarkable rounded stairs perfectly integrated into the facade.
Responding to the current highest energy standards (MINERGIE P) as well as the expectations of sustainable housing, each apartment is through; the bedrooms are located north, in the shade and coolness of the surrounding vegetation. The generous living areas are oriented south with large windows allowing to enjoy the panoramic view and to benefit from the large balconies including also wide covered and shaded terraces with movable louvers.
Apartment No. 9, with 4.5 rooms, located on the 3rd floor, occupying the west gable facade and through from north to south, consists of a generous day area of 53m2, three bedrooms, two bathrooms, including one en-suite, as well as a laundry room. A large fully covered balcony of 23m2 is accessible from all living areas and offers a spectacular panoramic view of the Alps and the lake.
Video presentation
https://youtu.be/uytKLCep7z8
Technical Data
| Date of availability | 31.08.2027 |
| Surface (m2) | 126 |
| objet.park | yes |
| objet.etat | New |
| Number of rooms | 4.5 |
| Year built | 2027 |
| Floor | 3 |
Finance your project